Italy

Rock fall protection s.s 45 bis “Gardesana Occidentale”

Year: 2008

Location: Brescia

Country: Italy

Volume: 7.500 m³ expanded clay 8-20 mm

Owner Builder: ANAS S.p.A.

Contractor: Carena S.p.A.

Designer: Studio Cancelli Associato


Problem / Solution

The construction of the new artificial tunnel on the s.s. 45 bis had to deal with issues of the high kinetic energy of falling rocks. In this case is necessary to increase the thickness of the fill above the gallery and to use a high absorbing material but more thickness can lead to problems of load on tunnel.

Experience

When the job completed has been appreciated also the speed of delivery and blowing of the expanded clay and easy handling due to its limited weight.

Why expanded clay?

The use of a thick layer of expanded clay fulfills the two requirements: the weight of expanded clay allows you not to oversize the structure and to absorb the energy released from the rocks. Also the expanded clay was easily blown above the tunnel and this has given advantages both economic and logistical.

PIC - TUNNELS AND STRUCTURAL ELEMENTS